Deck Construction

As mentioned in a prior post, the big project I was planning for spring was demolishing the old deck and building a new, larger, composite deck, along with a three season room, an outdoor kitchen space, and an improved hot tub patio with a new hot tub and outdoor TVs. The first actual step in … Continue reading Deck Construction

Theater Remodel

After redoing the flooring in the theater, I wanted to redo the rest of the room as well. I removed the old shelving and ceiling mounted the projector, and also moved the electronics to the back of the room. I installed built in shelving in the alcove that used to house the old free-standing shelving, … Continue reading Theater Remodel

Finishing the Bar

After installing the bar cabinetry and sink, there wasn’t a whole lot left to do. I glued the countertops in place and anchored the lower cabinets into the walls, and plumbed the sink. I then put bottles into place, and added a bunch of cool glassware and other bar tools. I also hung a small … Continue reading Finishing the Bar

Bar Cabinetry Install

Another late-winter / early-spring project I wanted to work on was remodeling the bar. The first phase of this project was driving to Indianapolis and picking up a new bar, and ordering new bar cabinets. The second phase was putting in new flooring. And the third phase was actually installing the bar cabinets and the … Continue reading Bar Cabinetry Install

So Much New Flooring

One of my big late-winter / early-spring projects was to finish all of the remaining flooring projects at the main house. These included: Mud Room Tile Kitchen Bathroom Tile Laundry Room File Guest Bathroom Tile Library LifeProof Vinyl Flooring Bar LifeProof Vinyl Flooring Guest House LifeProof Vinyl Flooring Theater LifeProof Vinyl Flooring Guest House LifeProof … Continue reading So Much New Flooring