Today was the final day of demolition for the lake house bathroom project: I removed all of the old shower plumbing from the wall, and removed all of the old lighting. I installed valves on the pipes to make it easier to do the new plumbing work, which I’ll start after Christmas.
I also stripped the last of the drywall that needed to be replaced due to water damage. The rest of it can stay since it will be behind the new shower walls anyway, and is still in very good shape.