The long project to remodel the master bathroom is slowly but surely winding to a close. Now that the cabinets, countertop, and tub are done, I’m moving on to the floors and shower. I recently took delivery of all of the fixtures and tile for the project, and plan on starting demolition and construction shortly after Thanksgiving.
Before that, I’m taking the opportunity to replace four of the six toilets in the house with new ones, since the master toilet was already going to be replaced anyway. For the master bathroom and the bathroom off the kitchen (which are the two most frequently used in the house), I went with a very high end Kohler unibody model, which will be easier to keep sparkling clean. For the other two bathrooms (the guest bathroom and the bathroom in my office), I went with more traditional Kohler models since those are used less frequently.
As I work my way through installing all of them, Mr. Paul the cat has attempted to help despite having no plumbing experience…

Everything should be done by the end of this week and ready for the next phase of construction to start after Thanksgiving!