Repaired Drywall Painting + Final Floor Prep

After the drywall repair that was done in mid-January, I repainted the walls and put all of the rooms back together, which was one of the last steps before all of my winter flooring work could begin.
After that, I worked to get everything cleared out for the new flooring. Most of this simply involved moving furniture off of the floors, but I to take apart the old bar and donate all of the old shelving. Thankfully, I was able to find good homes for everything. After the floors were cleared, I finished hauling in the rest of the flooring.
The very last step was to have Midwest Billiards come over and take apart the pool table, and move it plus the shuffleboard table to the guest house garage so that they were out of the way.