Finishing Guest House Bathroom Plumbing

Finishing Guest House Bathroom Plumbing

After the interior framing and electrical work was done, it was time to finish the plumbing by running hot and cold water lines through the interior walls for the shower, toilet, and sink. I drilled holes through the studs, and downsized the pipes from 3/4″ to 1/2″, and mapped out where the pipes would run:

After purchasing the fixtures and the pipes, it was a pretty smooth process to install everything.

Jon Hardin

Website: http://hardinhome.wordpress.com

By day, Jon is the CEO of a software company. Outside of work, Jon is an avid home improvement enthusiast who enjoys a wide variety of renovation, landscaping, and other projects.

Leave a Reply