Lake House Open For Summer

Lake House Open For Summer

Over Memorial Day Weekend, my wife and I spent the long weekend at the lake house and I got everything ready to go for summer. First, I did some minor repair and repainting work on the stairs and railing going down to the water.

Next, I repainted the shed and did other paint touchups around the exterior of the house.

After that, I installed a new outdoor table on the deck, and anchored it to the wood so that it wouldn’t be easily blown out of position by the wind.

img_1760

img_1759

Next, I used my chainsaw to chop up some of the downed trees from last spring that I had left where they fell. This opened up the paths to the left side of our land and made the view from the deck nicer.

img_1920

img_1841

img_1842

img_1814

img_1805

img_1803

Deano Dock and Lift came by and reset the dock, which had been knocked out of position over the winter, and I repainted the stairs that connect directly to the dock. This will likely be the last summer that this dock is in place, it’s showing its age and I am looking to switch to a dock that will have fewer problems with the current coming off of the river.

The last major task was to install the canopy and awning at the boat lift, which is always a somewhat miserable task since the heavy canvas has to be pulled over the the lip of the awning and dragged across the top while standing in the boat.

img_1827

img_1833

Once that was done, it was time to restock the fridge and the bar at the lake house, and then get out on the water.

img_1921

It’s been a beautiful couple of weekends of boating so far this year, hopefully the good weather continues!

Jon Hardin

Website: http://hardinhome.wordpress.com

By day, Jon is the CEO of a software company. Outside of work, Jon is an avid home improvement enthusiast who enjoys a wide variety of renovation, landscaping, and other projects.

Leave a Reply