Pool Installation

Despite the pool excavation being a little more involved than anticipated, the project to install the pool managed to roll on mostly on schedule. The Patio Pleasures team arrived, and started installing the pool walls and setting up the pump, filter, and heater. Next, the plumbing went in, along with the liner, and we could … Continue reading Pool Installation

Pool Excavation

After the grading for the pool was done and the land was surveyed, the next step was for the excavators to actually dig the hole for the pool, which turned into a much larger challenge than expected, and also turned into a logistical mess since I was coordinating the various contractors from Vegas (in a … Continue reading Pool Excavation

Wall Repair

Once my spring landscaping tasks were done, there was a final bit of work I needed to do outside at the Verona house. Over time, a section of the wall had sagged a little bit, and needed to be fixed. To address this, I dug holes around the concrete footings for the posts, and then … Continue reading Wall Repair

Three Season Room Interior

While the deck and three season room project isn’t completely done, it’s definitely getting close. Over the past couple of weeks, the three season room has turned into an actual building, complete with windows, doors, siding, and a (mostly) done interior. While the interior still needs trim, window casings, and some other minor touches, having … Continue reading Three Season Room Interior