Master Bathroom Tiling

After the demolition work was completed, we’ve been cruising along with tiling the master bathroom. Before the tiling could start, PermaBase UltraBacker underlayerment had to go in overtop of the old vinyl on the floor.
For the shower, we used the Schluter KERDI-BOARD system to waterproof the shower walls and basin and provide a backing for the shower tile.
After that was done, the tiling could start. The flooring has gone fairly quickly, since the tiles are large (12 x 24 inches) and the room is fairly rectangular.
The more complicated and dramatic tiling work was the shower itself, which involved a shinier version of the same 12 x 24 inch tiles, along with an accent stripe on the back wall and in the back of the KERDI-BOARD alcove shelves.
The tiling work should be done by the end of this week, and then all that will be left will be finishing the plumbing fixture installation, installing the new toilet, and getting the glass door measured, ordered, and installed.