Once my spring landscaping tasks were done, there was a final bit of work I needed to do outside at the Verona house. Over time, a section of the wall had sagged a little bit, and needed to be fixed. To address this, I dug holes around the concrete footings for the posts, and then was able to tilt the posts forward back to a straight position. After this, I poured additional concrete around the footings to lock them into place.


It was a relatively simple fix, but it worked very well and, along with replacing a few post caps, brought the wall back into tip-top shape.