Master Bathroom Tiling

After the demolition work was completed, we’ve been cruising along with tiling the master bathroom. Before the tiling could start, PermaBase UltraBacker underlayerment had to go in overtop of the old vinyl on the floor. For the shower, we used the Schluter KERDI-BOARD system to waterproof the shower walls and basin and provide a backing … Continue reading Master Bathroom Tiling

Master Bath Remodel

After the master bedroom remodel, one of the next projects on my list was a full master bath remodel. I worked with my interior designer to put together a full plan involving painting both the walls and the cabinets, new counters, sinks, and fixtures, new mirrors, new floors, and a completely new shower. Here is … Continue reading Master Bath Remodel

Well Electrical Repair

On this past Friday night, I noticed that the house wasn’t getting a consistent supply of water, and that air and air bubbles were starting to come out of the taps. Upon further investigation, I realized that the circuit breaker for the well had been tripped. I tried to switch it back on, but it … Continue reading Well Electrical Repair

Countertop Install, Part 2

After finally getting back from an awesome holiday vacation in Vegas, Palm Springs, Anaheim, and LA, it was time to finish the countertop install. Now that the cabinets were level, the installers came back. They used a counter joining tool that pressure sealed the two pieces together with glue in between. After the glue set, … Continue reading Countertop Install, Part 2